Calculation Of A Multi-Storey Building Unfinished Construction Established In A Seismic Area 8 Points.

Main Article Content

Alimov Xikmat Tairovich et al.

Abstract

The work contains the results of a survey of a multi-storey administrative building of unfinished construction with subsequent reconstruction. The data obtained in the calculation of the building using the LIRA 9.6 software package have been verified.

Article Details

Section
Articles